61 lines
3.1 KiB
Markdown
61 lines
3.1 KiB
Markdown
# PLAN — Bike-Tinder
|
||
|
||
**Status:** Planning (2026-11-10). Phases are gated: each lands, is verified, then the next begins. Glenn's standing rule applies — "pause" stops all spend immediately.
|
||
|
||
## v1 goal
|
||
|
||
A single-source, single-user, tailnet-only Tinder-style PWA on the Rotarran: nightly-updated catalog, swipe deck (Like / Nope / Maybe), full editable list, taste-ranked ordering.
|
||
|
||
## Phase 0 — Planning
|
||
|
||
- [x] Engineering consultation (Torres) → memo
|
||
- [x] Design docs in this repo: SOURCES, DESIGN, DATA-MODEL, RANKING, UI-SPEC
|
||
- [x] Glenn's calls (2026-11-10): v1 source = **Kijiji** · deck = show all, taste-ranked · new-bike feed = in-app badge only
|
||
- [x] Repo housekeeping (2026-11-10): branches `dev`/`main`/`release` · dedicated `bike-tinder-import` cron (parked for deploy) · stack-owned Tailscale sidecar in the deploy plan
|
||
- [ ] Glenn's skim of the docs — build gate opens after
|
||
- **Exit criteria:** docs merged to `main` (done 2026-11-10); source decision recorded in `SOURCES.md`.
|
||
|
||
## Phase 1 — Data spine
|
||
|
||
*(Build work lands on `dev`; verified milestones merge to `main`; deploys track `release`.)*
|
||
|
||
- DB schema + migrations (SQLite)
|
||
- Importer: source catalog → upsert into DB (new / changed / gone states)
|
||
- Cold-start scoring wired (existing rubric logic)
|
||
- Proof: CLI query shows a ranked, deduped queue from the real live catalog
|
||
- **Exit criteria:** importer runs clean twice in a row; counts reconcile against the source; no schema surprises.
|
||
|
||
## Phase 2 — The swipe app (core)
|
||
|
||
- 2–3 UI mock variants → Glenn picks one
|
||
- API (queue, swipe, edits, filters) + PWA frontend: card stack, drag physics, Like / Nope / Maybe, match moment
|
||
- Full list view with inline edit; basic filters
|
||
- Proof: runs locally, exercised on Glenn's phone over the tailnet dev port
|
||
- **Exit criteria:** Glenn can swipe a real deck on his phone and edit results in the list.
|
||
|
||
## Phase 3 — Personalization
|
||
|
||
- Swipe history → nightly retrain of explainable ranking
|
||
- Trends panel ("you lean: …"); "because you liked X" chips
|
||
- Deck ordering by learned taste with cold-start guardrails
|
||
- **Exit criteria:** after ~30 swipes, deck order visibly reflects taste; explainability shown in UI.
|
||
|
||
## Phase 4 — Deploy + automate
|
||
|
||
- Podman compose stack at `/var/mnt/DATA/podman-stacks/bike-tinder/` + systemd unit (`Delegate=yes`) + in-stack Tailscale sidecar serving `https://biketinder.tailf35a34.ts.net`; PWA install on Glenn's phone
|
||
- Enable the new `bike-tinder-import` Hermes cron (08:30 daily, post-hunt; script-only, zero LLM; parked until deploy); DB backup routine
|
||
- Runbook in DESIGN.md; announce + handover note
|
||
- **Exit criteria:** survives a reboot; refreshes overnight unattended; installable and used from the phone.
|
||
|
||
## Non-goals (v1)
|
||
|
||
- Multi-user accounts, social features, comments
|
||
- Additional sources (v2+); Facebook (never — manual by Glenn)
|
||
- Notifications beyond what already exists (Conduit is the house channel)
|
||
- Buying workflow (contact/inspection tracking) — possible v2
|
||
|
||
## Open decisions
|
||
|
||
- v1 source — **resolved 2026-11-10: Kijiji** (see `docs/SOURCES.md`)
|
||
- Mockup direction — Glenn picks at Phase 2 start
|