# PLAN — Bike-Tinder
|
||||
|
||||
**Status:** Build phase — Phase 2 complete + phone-proven (2026-11-10); **Phase 3 built, verified, and live on the dev server (2026-11-11)**; Phase 4 next. Phases are gated: each lands, is verified, then the next begins. Glenn's standing rule applies — "pause" stops all spend immediately.
|
||||
**Status:** Build phase — Phase 2 complete + phone-proven (2026-11-10); **Phase 3 built, verified, and live (2026-11-11); B1 photo experience v2 built, verified, and live (2026-11-11)**; Phase 4 next. Phases are gated: each lands, is verified, then the next begins. Glenn's standing rule applies — "pause" stops all spend immediately.
|
||||
|
||||
## v1 goal
|
||||
|
||||
@@ -59,7 +59,9 @@ Glenn's approved design (2026-11-10):
|
||||
|
||||
**Carried forward:** service-side OpenRouter key wiring at P4 — until then each forge's agent pass runs in mock mode and supersedes the live profile · wildcard pool hygiene (rare non-bike listings can surface) · early-ramp texture: dense nopes punish broad cells (year 2020+, 12k+, nb) — the Scouts read mid until the agent carves family-level exceptions · minor reload edge: an already-restruck second look can re-cycle on mid-section reload.
|
||||
|
||||
**Glenn's call (2026-11-10, late): B1 "Photo experience v2" pulled forward** — built next, *before* Phase 4 ("get that feature baked in before we proceed to phase 4"). Spec frozen in `UI-SPEC.md` §11 (galleries · tap-side photo flip · center-tap fullscreen viewer · fresh lead photo on repeats) + `DATA-MODEL.md` B1 additions. Rail side: hunt gallery capture + full-catalog backfill (Alex). App side: Torres on a fresh clone (`~/dev/bike-tinder-b1-build`) — the live tree and live DB stay untouched during the build; tests on port 9454 + DB copies.
|
||||
**Glenn's call (2026-11-10, late): B1 "Photo experience v2" pulled forward** — built next, *before* Phase 4 ("get that feature baked in before we proceed to phase 4"). Spec frozen in `UI-SPEC.md` §11 (galleries · tap-side photo flip · center-tap fullscreen viewer · fresh lead photo on repeats) + `DATA-MODEL.md` B1 additions.
|
||||
|
||||
**Status: BUILT → VERIFIED → LIVE (2026-11-11).** Rail: hunt gallery capture + full-catalog backfill — 636/640 state items carry `imgs[]`, 612 with 2+ photos. App: Torres on a fresh clone (`~/dev/bike-tinder-b1-build`, commits `3b64635..036a511`, report `~/dev/bike-tinder-b1/TORRES-B1-REPORT.md`); live tree + live DB untouched during the build. Verification: selfcheck 31/31 both sides; `fe_walk_b1` headless §11 walk 390/390 (Alex re-ran green with a fresh setup). **Live integration (2026-11-11, ~00:40 AST):** pre-B1 backups `~/dev/bike-tinder-b1/preb1-live-*.sqlite3` + `preb1-files/`; 11 files deployed; service restarted; `POST /api/import` idempotent (`new:0`); live DB now 639/640 with galleries, 612 multi-photo (sample id 430 Indian Sport Scout n=8; `/img/430?i=1` → 302). Live gesture proof: side-tap flip `?i=0 ↔ ?i=1`, center-tap viewer with segments, screenshot `~/dev/bike-tinder-b1/b1-live-9453.png`. Glenn's ledger intact (248 swipes / 279 events carried). `dev` + `main` merged (`49466fb`); live tree commit `3a399e1`.
|
||||
|
||||
## Phase 4 — Deploy + automate
|
||||
|
||||
|
||||