docs: B1 (photo experience v2) contract frozen — UI-SPEC §11 (galleries, photo flip, fullscreen viewer, repeat rotation), DATA-MODEL B1 additions; PLAN/BACKLOG: B1 pulled forward before Phase 4
This commit is contained in:
@@ -59,6 +59,8 @@ Glenn's approved design (2026-11-10):
|
||||
|
||||
**Carried forward:** service-side OpenRouter key wiring at P4 — until then each forge's agent pass runs in mock mode and supersedes the live profile · wildcard pool hygiene (rare non-bike listings can surface) · early-ramp texture: dense nopes punish broad cells (year 2020+, 12k+, nb) — the Scouts read mid until the agent carves family-level exceptions · minor reload edge: an already-restruck second look can re-cycle on mid-section reload.
|
||||
|
||||
**Glenn's call (2026-11-10, late): B1 "Photo experience v2" pulled forward** — built next, *before* Phase 4 ("get that feature baked in before we proceed to phase 4"). Spec frozen in `UI-SPEC.md` §11 (galleries · tap-side photo flip · center-tap fullscreen viewer · fresh lead photo on repeats) + `DATA-MODEL.md` B1 additions. Rail side: hunt gallery capture + full-catalog backfill (Alex). App side: Torres on a fresh clone (`~/dev/bike-tinder-b1-build`) — the live tree and live DB stay untouched during the build; tests on port 9454 + DB copies.
|
||||
|
||||
## Phase 4 — Deploy + automate
|
||||
|
||||
- Podman compose stack at `/var/mnt/DATA/podman-stacks/bike-tinder/` + systemd unit (`Delegate=yes`) + in-stack Tailscale sidecar serving `https://biketinder.tailf35a34.ts.net`; PWA install on Glenn's phone
|
||||
|
||||
Reference in New Issue
Block a user